South Carolina septic permits, through SCDES

The state handles septic permitting in South Carolina, not the county. Here's the process, the fees, and the parts that catch people out.

Start here

In South Carolina, septic permits are issued by SCDES through their ePermitting portal. The process starts with a site and soil evaluation carrying a $150 fee set by regulation. Once issued, a permit is valid five years provided the physical character of the property hasn't changed. It is unlawful to construct or operate a system without a Department-issued permit.

Agency name check. SCDHEC was split on 1 July 2024 under Act 60. Environmental functions, including onsite wastewater, moved to the new South Carolina Department of Environmental Services (SCDES). Public health functions went to the Department of Public Health. A great deal of published guidance, including some extension service material, still says "DHEC" and links a retired portal. If a contractor or a website is still telling you to file with DHEC, that's a signal about how current their information is.

What requires a permit

  • Any new installation. A construction permit is mandatory before work begins.
  • Repair, relocation or component replacement, including replacing a tank. You must notify SCDES first and they determine whether a new permit is required.
  • Adding bedrooms, remodels and changes of use. Where a change increases wastewater flow, changes its characteristics, or compromises the integrity of the system, you must submit an application and receive a permit to construct before any alterations, and bring the system into full compliance.

The site and soil evaluation

This is the gating step and it decides everything downstream. The soil evaluation must be performed by one of:

  1. 1

    A certified SCDES staff member

    The default route. Free of additional cost beyond the $150 fee, but you're on their scheduling.

  2. 2

    A licensed Professional Soil Classifier under contract to the Department

    Rate capped at three times the Department's permit fees.

  3. 3

    A privately hired licensed Professional Soil Classifier

    You pay for it, but you control the timeline. On a job where schedule matters, this is usually money well spent.

System layouts may be prepared by certified SCDES staff, a contracted registered professional engineer, or a privately hired engineer who also conducted the soil evaluation. Only a registered professional engineer may design specialized systems, large community systems, non-water-carried sewage treatment, wastewater combustion and gray water reuse systems.

Backhoe pits above the Fall Line

Since the 2022 rule changes, backhoe pits are required for all sites located above the Fall Line, rather than hand borings. The Fall Line runs northeast across Georgia through Augusta in a zone roughly twenty miles wide, which means whether your parcel needs a pit genuinely depends on the address, not just the county.

What the application has to contain

  • Written property owner permission on Department forms
  • Boundary plat, deed or legal description, with lot boundary lengths for properties of two acres or less
  • Easements where the infiltration area is remote from the dwelling
  • Soil boring descriptions, and backhoe pit reports where required
  • A site sketch marking property boundaries, building corners, well locations and drain field areas

Minimum site conditions

RequirementStandard
Vertical separation to zone of saturation, systems up to 1,500 gpd6 inches minimum
Depth to saturation, systems over 1,500 gpd36 in. below natural soil surface
Rock or restrictive horizonMore than 12 in. below deepest application point
Unsuitable soilsMassive or platy structure, substantial expansible clays

Setbacks

FromMinimum distance
Buildings and driveways5 feet
Property lines5 feet
Private well75 feet
Public well100 feet
Water bodies, at mean high water75 feet
In-ground pool15 feet
Upslope basement25 feet

Repair area: new systems require a usable repair or replacement area of at least 50 percent of the original system size, and 100 percent for community systems. This is one of the most common reasons a small lot fails.

Tank sizing

No septic tank may be installed with a net liquid capacity of less than 1,000 gallons. That covers homes up to four bedrooms. Add 250 gallons for each bedroom above four. Non-residential systems are sized from peak flow rates.

The process, end to end

  1. 1

    Submit through SCDES ePermitting

    Application, plat or deed with dimensions, property owner permission letter. Fee $150.

  2. 2

    Prepare the site

    Clear vegetation for evaluator access, stake and flag the building footprint, place site cards at the property entrance and the preferred system location.

  3. 3

    Site evaluation

    By an SCDES evaluator, or expedited with a private licensed soil classifier.

  4. 4

    Permit issued

    Comes back with the system sketch and installation location.

  5. 5

    Installation by a licensed installer

    Notifying the local SCDES office the day before final inspection.

  6. 6

    Final inspection and approval to operate

    Tier 3 installers may self-inspect their own installations. Tier 1 and Tier 2 may only do so with Department approval.

Installer licensing, and why the tier matters

TierScope
Tier 1Gravity-fed residential only. Cannot repair existing systems.
Tier 2Adds pumps, grease traps, curtain drains, elevated infiltration, mounded, and all commercial, large and community systems. May repair.
Tier 3All of the above plus Standard 610 specialized designs. Requires three years of clean installation history, plus insurance and bond at every renewal.

A separate pumper licence is required to clean systems and haul septage, so a full-service South Carolina septic company holds two SCDES licences. Ask any contractor which they hold and when they expire. Our credentials →

Straight answers

Common questions

Is it DHEC or SCDES now?
SCDES. DHEC was split on 1 July 2024 under Act 60, creating the South Carolina Department of Environmental Services and the Department of Public Health. Onsite wastewater moved to SCDES. A lot of published guidance, including some extension material, still says DHEC and links a retired portal.
How much does a South Carolina septic permit cost?
The site evaluation fee set by regulation is $150. National cost websites that list septic permits at $450 to $2,300 are quoting national averages that don't reflect South Carolina.
How long is a South Carolina septic permit valid?
Five years from issuance, provided the physical character of the property has not changed.
Can I hire my own soil classifier to speed things up?
Yes. The soil evaluation may be performed by certified SCDES staff, by a licensed Professional Soil Classifier under contract to the Department at a rate capped at three times permit fees, or by a privately hired licensed soil classifier. The private route costs more but you control the timeline.
What is a backhoe pit and do I need one?
A dug pit rather than a hand boring, allowing the evaluator to see the full soil profile. Backhoe pits are required for all sites located above the Fall Line, which runs through the Augusta area in a zone roughly twenty miles wide.
How far does a septic system have to be from a well?
75 feet from a private well and 100 feet from a public well. Also 5 feet from buildings, driveways and property lines, 75 feet from water bodies at mean high water, 15 feet from an in-ground pool, and 25 feet from an upslope basement.
Do I need a permit to add a bedroom?
Yes, before you build. Where a change increases wastewater flow, changes its characteristics or compromises system integrity, you must submit an application and receive a permit to construct prior to any alterations, and bring the system into full compliance.
Can a Tier 3 installer inspect their own work?
Yes. Under the regulation, Tier 3 installers may self-inspect their installations. Tier 1 and Tier 2 installers may only do so if approved by the Department. Registered professional engineers must inspect systems they design.
Get started

Get a real estimate, not a guess

Tell us about the property and what it's doing. We'll come look, tell you straight what it needs, and give you a number you can plan around.

  • 📞
    Call or text
    (803) 2-PUMP-IT803-278-6748
  • 🕐
    Office hours
    Mon-Fri, 8am-5pmEmergency service available outside these hours
  • 📍
    Based in
    North Augusta, SCServing the CSRA, both sides of the river

Request an estimate

Most requests get a call back the same business day.

📞 Call Now💬 Text Us